Located adjacent to National Highway 5 (from Hanoi to Hai Phong); about 28 km far from Hanoi, about 70 km far from Hai Phong port, about 110 km far from Quang Ninh deepwater port, 65 km far from Noi Bai Airport, 15 km far from Lac Dao Railway station.
Planning area: 345,2ha, of which phase 1: 219.6 ha, phase 2: 125.6 ha. The area of industrial land for lease is about 255.6 ha, the industrial land area that has been already leased is about 91 ha, the industrial land area that has completed infrastructure and ready for leasing is about 63 ha.
Technical Infrastructure of Industrial Park: Thang Long Industrial Park II was completed infrastructure construction and technical infrastructure for the first phase covering an area of about 25 ha; including water supply plant, 4,500m3/day-night (design capacity of 15,000 m3/day-night), concentrated wastewater treatment plant under European standards, with capacity of 3,000m3/day-night (design capacity of 15,000 m3/day-night), water drainage and supply system, traffic street system, fire protection system, communications system, ...
Investor of IP: Thang Long Industrial Park II Company Limited
- Address: Thang Long Industrial Park II, Yen My, Hung Yen.
- Phone / Fax: 0321.3974620.
- Email: kenta.kawanabe@sumitomocorp.co.jp.
Implementing the task of economic and social development in 2014 in th...
Hung Yen Province makes a breakthrough to attract investment capital
Electronic technology is being developed in Hung Yen Province
Vietnam is widely known as a country with a hidden tropical charm. Wit...
Prices of calendars for 2011 have grown by between 10% and 25% as the ...
good
normal
adequate